Homestead · built first

The hub

The first building, whose wood plant heats every other: three shipping containers under one timber roof, holding the boilers and the tank, the water and the power, a bathroom and a small kitchen, with a covered works between them and the woodshed under the roof carried down on the south.

340-ft high-cube containers
24 × 40feet, the covered works between
14'-6"clear under the ties
~11cords in the woodshed (estimated)
THE WORKS24' × 40' · covered · open eastA TRUCK, FOR SCALEWOODTANKPROPANE · PUMPSTHE PLANTRESERVOIRSPOWERKITCHENBATHWATER · POWER · KITCHEN · BATHSTORES · PARTS · TOOLSWOODSHED · ABOUT 11 CORDS STACKEDwood unloads herethe heat loop, south down the yard to the garage, the starter, the workshop and the house, ~1010 ftwater from the starter's well, ~390 ftthe farm's lines, westPROPANEDIESELTHE LANE, NORTH TO THE WOOD YARDthe drain, to the hub's own septicOPEN TO THE EAST8'-0"40'-0"8'-0"8'-0"24'-0"8'-0"N051020FEET
SheetU1
TitlePlan
ViewNorth up · feet
Drawn2026-09-27

Scroll the sheet sideways

The plant, the south container: a gasification wood boiler loaded through a door from the woodshed, one 1,000-gallon storage tank, a propane boiler, the headers and the pumps. The lines to every building leave it in one buried trench. Water, power and people, the north container: two stainless reservoirs, the panels, the inverter and the battery, a small kitchen and a bathroom. The stores close the west end against the winter wind and the afternoon sun, their side doors opening into the court.

BLACK AG · 24-in girts / drainage furringU9 · SS skirts, floor angles, screened cavitiesPLANTWATER · POWERTANKRESERVOIRsolarWOODTRUCKSTORES BEYOND · BLACK AG SIDING AND GABLEthe works: open to the east, closed to the west windchimneyTIE +14'-10"RIDGE +21'-4"CONTAINER +10'-0"8'-0"8'-0"24'-0"8'-0"0510FEET
SheetU2
TitleSection
ViewLooking west · feet
Drawn2026-09-27

Scroll the sheet sideways

One roof over all of it at 6/12, the ties at +14'-6", so a truck or a tractor fits under them. The court is left cold, open to the east and closed to the west. The south slope carries on down over the woodshed, where the wood dries in the sun, and carries the solar array east of the chimney, on rails clamped to the roof's standing seams.

WOOD BOILERWood Gun SE210CHIMNEYgravity dump, highLOADINGcombustion airSTORAGE TANK · 1,000 GAL · ASME41 in × 15'-11", 4 in of mineral wool in steel9 kWPROPANE2 × Knight WHB155HEADERS · PUMPSEXPANSIONCONTROLSHXGWTL-1044: plate + G / W pumpswall rack · EST envelopeseast under the floor to the lane, on to the workshop and the house, buriedthe hub loop and power, under the courtWOODSHEDSTORESCARGO DOORS1'-11"4'-6"4'-7"15'-11"13'-1"0248FEET
SheetU3
TitleThe plant
ViewThe south container · north up
Drawn2026-09-27

Scroll the sheet sideways

A Wood Gun SE210, 155,800 Btu/h in its EPA certification, loaded from its east face with the woodshed's door in front of it, about a million Btu a load. One 1,000-gallon ASME tank in 4 in of mineral wool holds ~810,000 Btu between 190 and 100 °F. Two Lochinvar Knights on propane, each vented in stainless steel, heat only the tank's top third. The tank and the boiler stand on piers of their own through the container's floor: the containers carry nothing heavy.

RESERVOIRS2 × 1,000 gal, stainlessthe well's line, up through the floorPUMP · TANKSTREATMENTPANELS · INVERTERBATTERYMETER · MAINgenerator inletFRIDGESINKCOOKTOPTABLEWCLAVSHOWERthe drain, buried, south under the courtWATERPOWERKITCHENBATHSTORES16'-0"7'-0"10'-6"6'-6"0248FEET
SheetU4
TitleWater, power and people
ViewThe north container · north up
Drawn2026-09-27

Scroll the sheet sideways

Two 1,000-gallon stainless cisterns filled from the well through an air gap, a booster, the treatment and the hub's own hot-water tank; the panels, a hybrid inverter and the battery; a kitchen and a bath, each opening from the court. Radiators keep the water room from ever freezing.

THE TANK1,000 gal, ASME, closed9 kW elementTWO PROPANE BOILERS2 × Knight WHB155, cascaded, 10:1fire when the tank's top coolsWOOD BOILERWood Gun SE210, 155,800 Btu/h~1 million Btu a load; leadsloading unitGRAVITY DUMPhigh over the boiler, 10 % of its outputa valve that opens when the power failssupplyreturnair sep.expansion, 2 × ~60 galfill: from the water room, through a backflow preventerTHE LOOPburied: the yard's garage, the starter, ~1010 ftto the workshop and the house; the farm; the north garageTHE HUB LOOPunder the court: the bath, kitchen, water room,and the hub's hot-water tank firstTHE WORKS' FLOORlater: a capped pair for a heated slabCONTROLSwood leads; propane, then the element,each below a lower setpoint (est.)30 psi relief → floor drainsupplyreturncold waterHyprotherm TL-1044, outdoors: glycol, plate exchangerTL-1044-WT 6/6Atmospheric jacket · glycolmix % UNKNOWN; keep ≥150 °FNOT RATED · morning and nightBRAZED PLATEin plant containerglycol | plain waterpressure separationBuried 2-in insulated pair · 131.6 ft incl. risersTank side: water, own pump30 psi tank; no direct jacket tie
SheetU5
TitleHeat
ViewA schematic
Drawn2026-09-27

Scroll the sheet sideways

Wood leads, propane follows, then the element, each below a lower setpoint. On a −25 °F day the site wants ~7.4 million Btu, about 7 loads of wood; the two propane boilers together carry ~288,000 Btu/h, the whole design night. If the power fails mid-burn, the pumps run on the battery and a gravity dump over the boiler takes 10 % of its output, as its manual asks.

WELL~150 ft, 6-in steel casingsubmersible pumpfrostpitless adapterburied 6 ft, type K copperRESERVOIRS2 × 1,000 gal stainless, in seriesair gapoverflow to daylight, screenedlevel switches run the well pumpboosterpressureTREATMENTsediment · softener if the testsays · UV lastHYDRANT AND FIRE HOSEat the court, before the treatment:2,000 gal at 25 gpm is ~80 min (est.)THE HUB'S FIXTURESkitchen sink, lavatory, WC, showerHOT WATERits indirect tank on the hub loop;a mixing valve (ASSE 1017)THE FARM'S WATERin its trench, with its heat(the house has its own)SEPTIC TANK AND FIELDthe hub's own, beside it(2026-10-06); its designer sizes itcast-iron drain, a 4-in sewerThe plant's floor drain and relief valves go to daylight,not to the septic; the propane boiler's condensategoes through a neutralizer into the drain.cold waterhot waterdrain, overflow
SheetU6
TitleWater and drains
ViewA schematic
Drawn2026-09-27

Scroll the sheet sideways

The reservoirs are piped in series so the water keeps moving through them; the hydrant and a fire hose draw before the treatment, 2,000 gallons at 25 gpm for about 80 minutes. The well stands well clear of the septic tank and its field, as the well code asks.

THE UTILITYburied from the road (est.)METER AND MAINoutside the north wall400 A class, 320 A cont. (est.)MAIN PANELthe power room, the grid's side:feeders, the element, thecooktop, the welder (U10)THE COMPLEX: ITS OWNmeter and service off the road,and its own water roomFARM, 200 A (EST.)~167 A at its stress casein the trench to the farmSOL-ARK 15K15 kW; 12 kW on the battery24 kW for 10 s; 200 A throughSOLAR~12 kW on the south slopeBATTERY2 × ~16 kWh LFP, 32 kWhunder NFPA 855's 40 kWhGENERATOR INLETon the north wall; 80 A to its GEN portHUB PANELbehind the inverter:the plant, the water,the rooms, the works;on the battery (U10)BONDINGevery container, the metal pipingand the frame's steel to one ground
SheetU7
TitlePower
ViewA one-line
Drawn2026-09-27

Scroll the sheet sideways

About 12 kW of panels on the south slope and a 32 kWh battery, under the fire code's limit for a utility room, behind a hybrid inverter that starts the well pump. The battery carries the heat plant, the water and the house's critical circuits for about 36 hours of a winter outage; the panels and a generator inlet carry it longer.

FROST, ~5 FT (EST.)heat: a pre-insulated twin line, 1½ in, 3 ft(PEX inside the jacket: the plastic we keep)conduits: the loop's controls and fibrewarning tapeSANDTHE HEAT LOOP'S TRENCH, ~1292 FT IN ALL, ~1008 TO THE WORKSHOP'S EAST GABLE
SheetU8
TitleThe services trench
ViewSection · feet
Drawn2026-09-27

Scroll the sheet sideways

One trench from the plant to the workshop: the water below frost, the heat line above it, the power and fibre conduits above that. The heat line is the one plastic kept here: PEX inside its jacket, with no warranted alternative.

The hub's power in three places: the meter and main disconnect outside the north wall; the main panel in the power room, on the grid's side, with the feeders and the loads that wait out an outage; and the hub panel behind the Sol-Ark, which the battery carries. The 2023 NEC, Wisconsin's since 1 September 2026. Copper THHN in EMT inside the boxes, 12 AWG the least; the feeders aluminium XHHW-2 in the trench's conduits. VA is the load calculation's figure, not a meter reading; the makers' figures are from their manuals, the rest marked est.

Hub panel, behind the inverter: 200 A bus, 40 spaces

CktLoadWhereBreakerWireVALeg
1, 3Well pump, 1 hp, 240 V: its controller on the reservoirs' level switcheswater20 A 2P12 Cu1,920A, B
2, 4Booster, ¾ hp, 240 V (est.)water20 A 2P12 Cu1,656A, B
5The works: receptacles on the posts, GFCI (est. 6)court20 A 1P12 Cu1,080A
6Water and power rooms: lights, receptacleswater, power20 A 1P12 Cu760A
7Wood Gun SE210: draft fan, controls, the loading unit's pump, the dump valveplant20 A 1P12 Cu900B
8The plant's lights and receptaclesplant20 A 1P12 Cu760B
9Counter receptacles, east, GFCIkitchen20 A 1P12 Cu720A
10The works: lights under the trusses (est. 6 × 100 W LED)court20 A 1P12 Cu600A
11Counter receptacles, west, GFCIkitchen20 A 1P12 Cu720B
12Refrigeratorkitchen20 A 1P12 Cu600B
13TL-1044 at its pad: blower, controls; a disconnect at the unitoutdoors, the pad15 A 1P12 Cu1,150A
14The loop's pump: the yard's line to the garage, the starter, the workshop and the house (est.)plant15 A 1P12 Cu400A
15Bath receptacles, GFCIbath20 A 1P12 Cu360B
16Knight WHB155, the first, and its boiler pumpplant15 A 1P12 Cu500B
17Hyprotherm tie: glycol pump, tank-side pump, its differential controlplant15 A 1P12 Cu400A
18The woodshed's and the doors' lightsoutside15 A 1P12 Cu300A
19Knight WHB155, the second, and its boiler pumpplant15 A 1P12 Cu500B
20The farm's and the north garage's pumps (est.)plant15 A 1P12 Cu400B
21Treatment: UV, the softener's headwater15 A 1P12 Cu150A
22Heat cable on the well line's riser through the skirt, GFPE (NEC 427)water15 A 1P12 Cu60A
23Kitchen and bath: lights, the hood, the bath fankitchen, bath15 A 1P12 Cu400B
24The hub loop's pump; the works' floor pump laterplant15 A 1P12 Cu250B
27The plant's controls: the tank's controller, the Knights' sequencer, contactor coilsplant15 A 1P12 Cu150B
28Network: the fibre's terminal, the router, the switchpower15 A 1P12 Cu150B

Legs: A 7,408 VA, B 7,478 VA. Calculated load (NEC 220; a hub is not a dwelling): 16,681 VA, 70 A at 240 V. It is fed from the Sol-Ark's load terminals through the inverter's own 200-A breaker, so the bus and the 3/0 Cu to it are rated 200 A; the grid reaches it through a 100-A breaker in the main panel (3 Cu). The grid's 100 A and the inverter's 62.5 A × 1.25 make 178 A against the bus's 240 A (705.12(B)(3)(2)). 6 spaces are left empty.

Main panel, the grid's side: 400 A bus, 20 spaces

CktLoadWhereBreakerWireVALeg
1, 3Farm feeder, ~193 ftfeeder200 A 2Pthe feederspendingA, B
2, 4The Sol-Ark 15K's grid port: the hub panel through itpower100 A 2P3 Cu16,681A, B
5, 7The tank's element, 9 kW, on its controller's contactorplant50 A 2P8 Cu9,000A, B
6, 8The works' 240-V receptacle, NEMA 6-50: the welder, the compressor (est.)court50 A 2P8 Cu6,000A, B
9, 11Cooktop, 30-in induction (est. 7.4 kW; NEC 220.55 counts 8 kW)kitchen40 A 2P8 Cu8,000A, B

The cooktop, the element and the welder are on this side on purpose. In an outage they are off, so they can never trip the inverter while it carries the boilers' pumps; on the generator the same holds, since the generator feeds the hub panel only. The cost: no cooking in the hub on the battery or the generator.

The feeders

ToBreakerRunConductorsDrop
Farm200 A 2P~193 ft250 Al2.2 % at 160 A

Sized by Table 310.16 at 75 °C, then up until the drop is 3 % or less at 80 % of the breaker (est.: the farm has no load calculation yet). The run: the power room along the hub's west wall and out with the farm's lines to its panel, 25 ft inside (est.). A conductor upsized for the drop takes a larger equipment ground in proportion (250.122(B)). The house and the workshop have a service of their own off the road, so the hub feeds only the farm; their own panels and their backup in an outage are still to draw.

The checks

A cold night, the grid down: all of the hub panel's loads that would run5,140 W; the Sol-Ark gives 12,000 W on the battery alone
The well pump starting on top of that (48.7 A locked rotor)15,618 VA; it gives 24,000 VA for 10 s
The Sol-Ark feeding back into the main panel's 400-A bus, at the end away from its feed (705.12(B)(3)(2))478 A against 480 A: just

The well pump and the booster are interlocked so they never start together. The dump valve shares the wood boiler's circuit, so a tripped breaker opens it as a power failure does. The two Knights each have a circuit of their own, so one breaker can stop only one boiler. The service's size waits on the farm's own load calculation (U7).

SheetU10
TitlePanels
ViewSchedules and the battery's checks
Drawn2026-09-27

Scroll the sheet sideways

Three places for the power: the meter and main disconnect outside, the main panel on the grid's side with the feeders and the loads that wait out an outage, and the hub panel behind the inverter, which the battery carries. The cooktop, the tank's element and the welder's outlet stay on the grid's side, so an outage can never overload the inverter while it runs the boilers' pumps. Each feeder is sized for its voltage drop over its run.

the steel roof over the containersWATERPOWERKITCHENBATHthe gap under the floor: skirted, unheated; no trap and no water line in itGRADETREATMENTfrom the boosterand pressure tank40 GALINDIRECTASSE 1017to the plant, under the court below frost:the boilers' fill through a backflow preventer,and the farm's water, in its trench (U5)¾-in cold and hot at the ceiling along the court-side wall, clear of the panels' space (NEC 110.26(E)) and not over the batteryKITCHEN SINK2 DFU1½-in trap2 in (est.)TOILET4 DFU3 inLAVATORY1 DFU1¼-in trap2 in (est.)SHOWER2 DFU · 2-in trap6-in base2 ineach vent to the header over the rims, and so to the stack3-in stack through both roofs, 8 in or more above the steel (SPS 382.31(16))the building drain, buried under the container, under foam board (est.)the sewer: 4 in, ⅛ in a foot,~58 ft to the hub's own septic tank (U1)9 DRAIN FIXTURE UNITS · 6 SUPPLY FIXTURE UNITS · ½ IN TO EVERY FIXTUREcold water, copper type Lhot water, copper type Ldrain, cast ironvent, cast iron
SheetU11
TitlePipes
ViewSupply, drains and vents · a schematic
Drawn2026-09-27

Scroll the sheet sideways

Copper for the water, cast iron for every drain and vent. The containers stand on piers over a skirted, unheated gap, so every trap and every water line stays inside the warm box: the shower sits on a raised base, and each fixture drains straight down through the floor to a buried drain that runs on to the septic tank, bent clear of the piers.

Why it comes first

  • Boilers are noisy and don't belong in a house. Everything that burns lives here, beside the tank, away from where people live and work; no propane ever enters the house or the workshop.
  • It serves the build. With the well, the septic and the power, it gives the crew heat, water, a bathroom and a kitchen on the site from the first day, and a covered works to outfit the bunkers' containers in.
  • It serves every building after. Each takes its own buried branch and keeps a small hot-water tank of its own, so its taps run hot at once.
  • To settle with the installers: the storage tank's stamp at its working pressure; the propane tank to its supplier's setbacks; the treatment, from the water test.